    1 column, floor is C30 concrete, the concrete C10 concrete template may not run;
    2, rise model, size accurate;
    3 embedded parts required precise control of position, orientation and size of not greater than 5mm, standard deviation of not greater than 2mm ( string embedded parts determined);
    4 embedded parts for Q235B steel, bolt shall not cold after molding, wire rod for M24 ordinary coarse;
    5 embedded parts of wire rod before concreting shall take protective measures;
    6 pillars height H need according to the actual terrain and solar structure determination.

    1φ is a steel,Φtwo grade steel, reinforcement protection layer thickness of plate column: 30mm, 50mm, 25mm
    2 should tamp the foundation columns; processing, bedding concrete hardening before lashing the upper bar;
    3 steel binding sequence should first floor after column, column stirrup ( especially encryption section) to ensure quantity;
    4 foundation backfill should be compacted layer by layer to the design elevation, and 5% of the apron slope, backfill severe shall not be less than 16KN\/M3\/; the
    5 Foundation and construction should abide by the following norms relevant provisions;
    ( 1) acceptance of construction quality of building foundation ( GB50202-2002 )
    ( 2) code for acceptance of constructional quality of concrete structures specification ( GB50204-2002 )
    6 in case of soil and other anomalies, should contact the relevant departments;
    7 according to the local groundwater level to take corresponding drainage measures.